Evaluation of the dynamic stochastic project management in resource constrained project teams using the Finite Task method
نویسندگان
1 Mendel University, Zemědělská 1/1665, 613 00 Brno, Czech.
doi
10.22105/jarie.2025.506988.1746چکیده
In the context of resource-constrained environments, this paper proposes a method that describes project work based on a Finite Task description. For this purpose, the Finite Task Method (FTM) is introduced, which allows different configurations of project work with resource constraints to be analyzed using matrix-based project descriptions based on an explicit problem-solving strategy. This paper aims to apply the FTM to evaluate project performance and resource consumption. Instead, a case study is used to show how differences in Project Management (PM) approaches, such as traditional and agile PM, can be evaluated.