Two-Pillar Risk Management (TPRM): A Generic Project Risk Management Process
نویسندگان
1 Department of Industrial Engineering,Iran University of Science and Technology
2 Department of Industrial Engineering,Iran University of Science and Technology
doi
چکیده
A conventional Risk Management Process (RMP) contains two main phases: (a) risk assessment that includes risk identication and risk analysis, and (b) risk response that decides what, if anything, should be done about the analyzed risks. Based on a traditional tendency, most studies in stateof- the art RMP have ample emphasis on risk assessment, but we can nd limited studies on the subject of risk response. This paper aims to oppose the mentioned traditional view. The paper introduces a generic RMP, namely Two-Pillar Risk Management (TPRM) that considers an equivalent importance for both risk assessment and risk response. The paper compares the TPRM with the last version of the RMP provided in the standard of PMBoK. Application of the proposed model in projects in the construction industry shows a tremendous total risk level improvement. We believe that applying the TPRM helps project managers in a most eective and ecient manner in dealing with their risk management programs.